Metro line 4 (Budapest)

In 2006 Novoproject won the tender for project management and consultancy (as FIDIC engineer) of the structural construction of Móricz Zsigmond metro station as a subcontractor of Eurometro LTD. During the final stages of the structural construction we also worked in building inside engineering and electrical installations. We were involved in project management and six of our engineers were employed to fulfil these tasks.

Some data to illustrate the volume of the construction:

  • Diaphragm thickness: 1.2 m
  • Volume of D-wall concrete built in: 10,000 m3
  • Volume of base slab concrete: appr. 9,200 m3
  • Thickness of base slab: 3-5 metre
  • Reinforcement bar built into the base slab: 1,120 tons
  • Volume of excavated soil: appr. 80,000 m3